Tracking 38,817 interconnection queue requests from 1996 to 2025
[Live Data] Updated from public data sources today. (What is the interconnection queue?)
Created by Steven Zhang & Chris Talley
Use the sidebar to filter.
See data table & graphs here.
Sign up for updates here.Created by Steven Zhang & Chris Talley
Queue changes in the last 1 week (see all)
Tevis 12kV out of Stadium 66/16 kV Substation
— 0MW battery + solar 🔋☀️ project in Los Angeles, CA (CAISO). Proposed completion changed to February 28, 2018
North Oaks Substation at the 66 kV bus.
— 88MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from November 30, 2023 to October 15, 2020
Sunset 12 kV circuit
— 5MW solar ☀️ project in Tulare, CA (CAISO). Proposed completion changed to December 31, 2026
The point where the 66 kV tap line from Growers Substation interconnects to the Vestal-Growers-Kern River No. 3 66 kV Line
— 58MW solar ☀️ project in Tulare, CA (CAISO). Proposed completion changed from October 31, 2021 to May 1, 2019
Dylan 115 kV Substation at the 115 kV bus
— 116MW battery 🔋 project in Riverside, CA (CAISO). Proposed completion changed from March 1, 2024 to October 15, 2021
Bruin 66 kV Substation at the 66 kV bus
— 46MW battery + solar 🔋☀️ project in Kern, CA (CAISO). Proposed completion changed from October 1, 2028 to January 31, 2018
Lockhart 33 kV
— 4MW battery + solar 🔋☀️ project in San Bernardino, CA (CAISO). Proposed completion changed from December 1, 2023 to October 15, 2019
Bridgeport Energy PSS Tuning
— gas 🔥 project in Fairfield County, CT (ISO-NE). Proposed completion changed from October 28, 2016
Kenworth 12.47kV line connecting to the Roadway substation
— 3MW gas 🔥 project in San Bernardino, CA (CAISO). Proposed completion changed from June 1, 2020 to December 31, 2018
Pisces 12kV
— 0MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed to February 15, 2018
Stetson Wind II(Jimmey & Owl Mt.-UPC)
— 2MW wind 💨 project in Washington County, ME (ISO-NE). Proposed completion changed from March 12, 2010
Huron 12kV
— 1MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed to December 1, 2011
230 KV T-Line
— project in Chelan, WA (Chelan County Public Utility District). Proposed completion changed from February 1, 2026 to February 1, 2027
Grazide 12kV
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from June 25, 2018 to May 28, 2018
Barre 66 kV Bus
— 50MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed to April 30, 2019
Recovery 12 kV Line
— 1MW gas 🔥 project in Orange, CA (CAISO). Proposed completion changed from June 1, 2013 to June 30, 2012
A tap on the Distribution Provider’s Buckhorn 16 kV distribution line out of Fillmore 66/16 kV Substation
— 2MW solar ☀️ project in Ventura, CA (CAISO). Proposed completion changed from October 1, 2018 to June 30, 2018
SUN VILLAGE 12KV
— 1MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from July 1, 2013 to March 1, 2012
Riverside Substation, Great Falls, MT
— 3MW solar ☀️ project in Cascade County, MT (NorthWestern Energy). Proposed completion changed to July 31, 2016
Oasis 66 kV Bus
— 20MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from October 13, 2015 to August 1, 2013
Lilac Substation - Distribution Circuit 350
— 3MW solar ☀️ project in San Diego, CA (CAISO). Proposed completion changed from June 1, 2014 to February 1, 2016
Craig 345kV Substation
— 299MW battery + solar 🔋☀️ project in Moffat County, CO (Tri-State Generation and Transmission Association). Proposed completion changed to June 25, 2030
SANTANA 33 kV line
— 0MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed from September 20, 2012 to October 15, 2012
Medway Peaker - SEMARI
— 207MW gas + oil 🔥⛽ project in Norfolk County, MA (ISO-NE). Proposed completion changed from March 14, 2019
Ponderosa-Houston Lake transmission line
— 60MW solar ☀️ project in Crook, OR (PacifiCorp). Proposed completion changed from July 1, 2018 to February 28, 2021
Elden 12kV
— 0MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from February 2, 2018 to February 18, 2018
Marriott 12kV
— 0MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from November 11, 2019 to September 13, 2019
Litchfield substation - NG Western MA Area Cluster Study
— 9MW solar ☀️ project in Worcester County, MA (ISO-NE). Proposed completion changed from April 30, 2021
Styx PT 12kV
— 3MW project in San Bernardino, CA (CAISO). Proposed completion changed to November 1, 2022
GEE BEE 12KV
— 1MW solar ☀️ project in Tulare, CA (CAISO). Proposed completion changed from January 17, 2014 to October 1, 2012
A tap on the Distribution Provider’s Hackman 33 kV distribution line out of Searles 115/33 kV Substation via a line extension to the Customer-owned 38.0 kV rated switchboard.
— 1MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed from September 1, 2021 to October 17, 2018
Bridgeport Energy Uprate
— 84MW gas 🔥 project in Fairfield County, CT (ISO-NE). Proposed completion changed from June 5, 2015
Torson 16kV
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from April 30, 2019 to December 28, 2018
Vestal Substation 66 kV bus
— 106MW battery + solar 🔋☀️ project in Tulare, CA (CAISO). Proposed completion changed from September 15, 2024 to September 15, 2023
Empresa 12kV
— 0MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from January 15, 2018 to December 4, 2017
N. Oxford Substation - NG Western MA Area Cluster Study
— 8MW solar ☀️ project in Worcester County, MA (ISO-NE). Proposed completion changed from December 30, 2020
Otay Mesa Substation - Distribution Circuit 150
— 1MW gas 🔥 project in San Diego, CA (CAISO). Proposed completion changed from April 1, 2013 to June 18, 2013
Hillclimber Solar, Givens-Mechanicsburg 138 kV
— 40MW battery 🔋 project in Champaign County, OH (PJM). Proposed completion changed from December 1, 2021 to September 30, 2029
Midge 12 kV
— 5MW solar ☀️ project in Kern, CA (CAISO). Proposed completion changed to September 1, 2024
Existing System on Line 40 from White City to Vilas Road
— 30MW biomass 🌿 project in Jackson, OR (PacifiCorp). Proposed completion changed from September 10, 2007 to February 3, 2009
Circuit 4U30 out of Southgate substation
— 1MW biogas 🌿 project in Douglas, OR (PacifiCorp). Proposed completion changed from October 1, 2011 to November 21, 2011
Heisman 12 kV Circuit
— 2MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from December 5, 2026 to October 3, 2026
Windhub 66 kV Substation at the 66kV bus
— 25MW solar ☀️ project in Kern, CA (CAISO). Proposed completion changed from July 20, 2019 to March 1, 2011
Intrepid 16 kV circuit out of Newbury 66/12 kV Substation
— 2MW battery 🔋 project in Ventura, CA (CAISO). Proposed completion changed from January 15, 2020 to February 1, 2020
Stitzer 12kV
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from December 1, 2018 to August 1, 2018
The Distribution Provider’s Goleta-Isla Vista-Onshore 66 kV line via Ellwood Substation
— 39MW battery 🔋 project in Santa Barbara, CA (CAISO). Proposed completion changed from November 1, 2025 to August 30, 2024
Hinkle substation
— 6MW wind 💨 project in Umatilla, OR (PacifiCorp). Proposed completion changed from December 15, 2007 to February 23, 2009
Circuit WCD28 out of West Cedar substation
— 3MW solar ☀️ project in Iron, UT (PacifiCorp). Proposed completion changed from May 30, 2016 to December 13, 2016
Hughes Lake 12 kV Circuit
— 6MW battery + solar 🔋☀️ project in Los Angeles, CA (CAISO). Proposed completion changed to October 31, 2019
Deer 12 kV
— 10MW battery + solar 🔋☀️ project in Tulare, CA (CAISO). Proposed completion changed to November 15, 2025
White Lake Substation, SD
— 20MW wind 💨 project in Aurora County, SD (NorthWestern Energy). Proposed completion changed to December 1, 2016
Artisano 16kV
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from June 28, 2017 to April 28, 2017
Pence 12 kV
— 0MW solar ☀️ project in Orange, CA (CAISO). Proposed completion changed from March 31, 2023 to December 1, 2022
34.5kV
— 10MW wind 💨 project in Cassia County, ID (Idaho Power Company). Proposed completion changed from January 1, 2004 to December 1, 2010
Goleta 66kV Substation
— 102MW gas 🔥 project in Santa Barbara, CA (CAISO). Proposed completion changed to May 1, 2009
Northwest substation
— 25MW gas 🔥 project in Salt Lake, UT (PacifiCorp). Proposed completion changed from January 1, 2004 to October 6, 2004
Wakefield 66 kV bus
— 18MW battery 🔋 project in Ventura, CA (CAISO). Proposed completion changed from August 1, 2025 to March 1, 2022
SCE 66KV Vestal Substation
— 50MW battery 🔋 project in Kern, CA (CAISO). Proposed completion changed to July 1, 2022
Alturas-Mile Hi transmission line
— 46MW solar ☀️ project in Lake, OR (PacifiCorp). Proposed completion changed from December 1, 2017 to November 1, 2019
Bow 12kV
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed to May 25, 2017
DESERT CENTER 12KV
— 1MW solar ☀️ project in Riverside, CA (CAISO). Proposed completion changed from July 27, 2014 to December 31, 2012
Goshen-Hanford 66kV
— 10MW solar ☀️ project in Kings, CA (CAISO). Proposed completion changed to September 1, 2014
Maplewood
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from January 31, 2017 to October 31, 2016
Canyon View Rd and Desert View Rd, Apple Valley CA 92308
— 1MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed from December 31, 2012 to December 31, 2011
Ellis 66kV Substation
— 111MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed to June 30, 2021
Melrose Substation - Distribution Circuit 0206
— 2MW other storage 🔋 project in San Diego, CA (CAISO). Proposed completion changed from September 30, 2015 to October 31, 2017
Hampshire 16kV
— 0MW battery + solar 🔋☀️ project in Ventura, CA (CAISO). Proposed completion changed from October 4, 2019 to August 12, 2019
Sturgeon 12kV circuit
— 5MW solar ☀️ project in Tulare, CA (CAISO). Proposed completion changed to September 1, 2024
Norton 12kV
— 0MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed to June 30, 2011
Foxglove 12kV
— 0MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from February 28, 2018 to December 15, 2017
Silver Maple Wind CNR
— wind 💨 project in Penobscot County, ME (ISO-NE). Proposed completion changed from December 14, 2022
Apex 16kV
— 0MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed to February 28, 2014
The Distribution Provider’s 3-way switch on the Distribution Provider’s Cribbage 12kV distribution line out of Johanna 66/12kv Substation
— 10MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from November 15, 2019 to December 1, 2018
Regal 12kV
— 0MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed to December 1, 2011
Waterside Power
— gas 🔥 project in Fairfield County, CT (ISO-NE). Proposed completion changed from June 1, 2003
Seabrook LP Turbine Blade replacement
— 13MW nuclear ☢️ project in Rockingham County, NH (ISO-NE). Proposed completion changed from April 5, 2012
New 16 kV Distribution Circuit out of Elizabeth Lake 66/16 kV Substation via a new 16 kV circuit
— 15MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from December 1, 2023 to November 1, 2022
Kendall Reconfiguration Project
— 1MW gas + oil 🔥⛽ project in Middlesex County, MA (ISO-NE). Proposed completion changed from May 31, 2016
Olinda Substation 66 kV
— 127MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from April 1, 2026 to January 4, 2026
480V secondary side of the SCE provided serviced transformer
— 1MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to December 10, 2012
Showcase 16kV
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from June 1, 2015 to December 20, 2015
ANDRETTI 12KV
— 0MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed from May 31, 2011 to December 1, 2012
San Ysidro 2.4kV
— 0MW battery 🔋 project in Santa Barbara, CA (CAISO). Proposed completion changed from September 30, 2018 to August 2, 2018
Moore Station Uprate
— 4MW hydro 💧 project in Grafton County, NH (ISO-NE). Proposed completion changed from October 18, 2023
Dolores Ave. Cabazon, CA 92230
— 0MW solar ☀️ project in Riverside, CA (CAISO). Proposed completion changed from March 30, 2013 to March 30, 2011
Raven substation
— 80MW solar ☀️ project in Sweetwater, WY (PacifiCorp). Proposed completion changed from November 1, 2018 to December 3, 2018
Hunt–Milner 138kV Line
— 120MW solar ☀️ project in Jerome, ID (Idaho Power Company). Proposed completion changed from December 1, 2020 to October 31, 2023
230kV
— 20MW wind 💨 project in Elmore County, ID (Idaho Power Company). Proposed completion changed from June 30, 2011 to May 31, 2012
Darby 4.16kV
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from February 15, 2018 to October 19, 2017
Huntington Power Plant, Huntington, Utah
— 17MW coal 🏭 project in Emery, UT (PacifiCorp). Proposed completion changed from December 26, 2015 to May 2, 2012
Churchill 12kV
— 0MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from June 1, 2018 to January 1, 2018
138kV
— 40MW wind 💨 project in Twin Falls, ID (Idaho Power Company). Proposed completion changed from December 31, 2010 to November 15, 2012
Union Gap - Midway line
— 94MW battery + solar 🔋☀️ project in Yakima, WA (PacifiCorp). Proposed completion changed from December 1, 2020 to November 20, 2023
Beijing 12 kV line
— 2MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from June 30, 2018 to October 31, 2017
Stealth 12kV Ckt. VS631361, POI 34.646189, -118.095377
— 2MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed to October 1, 2017
Nashua-St. Joe 345kV
— 400MW solar ☀️ project in Hodgeman County, KS (SPP). Proposed completion changed from June 1, 2029 to January 15, 2029
Tanager 12kV
— 0MW battery + solar 🔋☀️ project in Kern, CA (CAISO). Proposed completion changed from September 23, 2019 to April 23, 2019
A tap on the Distribution Provider’s existing Montara 33 kV distribution line out of Barstow 33 kV Substation via an overhead line extension to the Distribution Customer-owned 35.0 kV switchboard
— 3MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed from August 1, 2020 to July 31, 2019
Bloom Energy Fuel Cell
— 10MW other 🔌 project in New London County, CT (ISO-NE). Proposed completion changed from October 20, 2021
Circuit PAN12 out of Panguitch substation
— 1MW battery 🔋 project in Garfield, UT (PacifiCorp). Proposed completion changed from May 31, 2018 to January 16, 2020
INDEPENDENCE-ISES - POWERLINE ROAD 500.0kV
— 652MW solar ☀️ project in Jackson County, AR (MISO). Proposed completion changed from February 2, 2024 to July 20, 2029
Lake Road Generating Unit 3
— gas + oil 🔥⛽ project in Windham County, CT (ISO-NE). Proposed completion changed from May 22, 2002
Pecos 12kV
— 0MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from July 10, 2018 to October 1, 2017
The Distribution Provider's Vella 33 kV circuit out of Eisenhower 115/33 kV Substation
— 13MW battery 🔋 project in Riverside, CA (CAISO). Proposed completion changed from November 1, 2022 to January 2, 2021
Weeks 12 kV line out of Narod 66/12 kV Substation
— 10MW battery 🔋 project in San Bernardino, CA (CAISO). Proposed completion changed from November 30, 2016 to October 31, 2016
Craig-Meeker 345kV Line
— 145MW solar ☀️ project in Moffat County, CO (Tri-State Generation and Transmission Association). Proposed completion changed to June 30, 2024
Armijo 12 kV Circuit
— 5MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to April 1, 2025
El Nido: Seabass 16 kV line
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from September 25, 2014 to January 8, 2013
Riverview Substation
— 2MW hydro 💧 project in Cascade County, MT (NorthWestern Energy). Proposed completion changed to April 2, 2021
Radnor 12kV Circuit
— 10MW battery + solar 🔋☀️ project in Tulare, CA (CAISO). Proposed completion changed to September 1, 2024
Cady Substation at 34.5 kV
— 10MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to September 1, 2012
the Tejon 12kV circuit out of the Neenach 66/12kV Substation
— 3MW wind 💨 project in Los Angeles, CA (CAISO). Proposed completion changed from March 1, 2019 to February 1, 2018
Rockair leg of Helijet - Little Rock - Palmdale - Rockair 66 kV line
— 50MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed to March 1, 2011
Krypton 12kV
— 0MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from November 1, 2018 to August 27, 2018
Cardiff 12: LENA 12 kV line
— 0MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed from November 1, 2013 to June 30, 2011
SUN VILLAGE 12KV
— 1MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from July 1, 2013 to March 1, 2012
Roadway 12kV
— 2MW battery 🔋 project in San Bernardino, CA (CAISO). Proposed completion changed to June 7, 2024
Chula Vista Substation - Distribution Circuit 152
— 3MW other storage 🔋 project in San Diego, CA (CAISO). Proposed completion changed from July 1, 2022 to June 8, 2023
Circuit 4K36 out of Dalreed substation
— 9MW wind 💨 project in Morrow, OR (PacifiCorp). Proposed completion changed from February 1, 2007 to July 15, 2009
Dogbane 12 kV Circuit
— 5MW battery 🔋 project in Kern, CA (CAISO). Proposed completion changed from February 1, 2026 to March 1, 2024
Riptide 16kV
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from May 31, 2017 to April 1, 2017
Shell 12kV
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from December 31, 2016 to October 31, 2016
Reed Point Substation, Reed Point
— 2MW solar ☀️ project in Stillwater County, MT (NorthWestern Energy). Proposed completion changed to April 1, 2016
A tap on the Distribution Provider’s Milk 12 kV distribution line out of Tulare 66/12 kV Substation
— 3MW solar ☀️ project in Tulare, CA (CAISO). Proposed completion changed from June 19, 2019 to July 1, 2017
GMP Essex Diesel
— oil ⛽ project in Chittenden County, VT (ISO-NE). Proposed completion changed from October 30, 2007
Krypton 12kV
— 0MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from October 1, 2018 to May 4, 2018
Queensland 12kV
— 3MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from October 30, 2012 to October 30, 2015
Elliott Substation, 12kv Circuit 1266
— 10MW other storage 🔋 project in San Diego, CA (CAISO). Proposed completion changed from October 31, 2020 to October 18, 2023
Salem Harbor Unit 3 Exciter Replacement
— coal 🏭 project in Essex County, MA (ISO-NE). Proposed completion changed from May 4, 2007
12.5kV
— 3MW wind 💨 project in Baker, OR (Idaho Power Company). Proposed completion changed from January 1, 2009 to November 25, 2011
Weston P substation at 69 kV, on the line Athena side of the NO switch
— 18MW wind 💨 project in Umatilla, OR (PacifiCorp). Proposed completion changed from November 30, 2015 to October 15, 2016
Shooter 12kV
— 1MW battery + gas 🔋🔥 project in Orange, CA (CAISO). Proposed completion changed from March 15, 2020 to March 1, 2020
Hinkle substation
— 1MW wind 💨 project in Umatilla, OR (PacifiCorp). Proposed completion changed from December 15, 2007 to January 11, 2010
Francis 66 kV Substation at the 66 kV bus.
— 42MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from April 30, 2025 to October 30, 2022
Boone 12 kV
— 11MW solar ☀️ project in Kern, CA (CAISO). Proposed completion changed to September 1, 2024
Goldtown 66/12kV Substation connected to the Boxcar 12 kV circuit
— 3MW solar ☀️ project in Kern, CA (CAISO). Proposed completion changed from July 7, 2017 to December 1, 2016
Margarita Substation, Distribution Circuit 983
— 1MW solar ☀️ project in San Diego, CA (CAISO). Proposed completion changed from August 31, 2018 to December 30, 2019
Bluefield 12 kV
— 0MW solar ☀️ project in Orange, CA (CAISO). Proposed completion changed to July 15, 2023
Amps substation
— 200MW battery + solar 🔋☀️ project in Clark, ID (PacifiCorp). Proposed completion changed from December 1, 2023 to December 20, 2030
Cottonwood-Savage 115 kV line near Cottonwood substation
— 200MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to January 1, 2010
Emery substation
— 200MW battery + solar 🔋☀️ project in Emery, UT (PacifiCorp). Proposed completion changed from December 31, 2018 to August 31, 2024
Victor-Black Mountain-Soport-Southcap-Southdown 115 kV line at Southdown Substation
— 20MW gas 🔥 project in San Bernardino, CA (CAISO). Proposed completion changed from April 1, 2022 to April 1, 2021
Seabrook PSS Enabling
— nuclear ☢️ project in Rockingham County, NH (ISO-NE). Proposed completion changed from November 1, 2009
Concho Solar I
— 17MW solar ☀️ project in Queen Annes County, MD (PJM). Proposed completion changed from June 3, 2027 to June 3, 2024
Milford Upgrades - Phase I
— 16MW gas 🔥 project in New Haven County, CT (ISO-NE). Proposed completion changed from June 5, 2017
Vestal Substation 66 kV bus
— 88MW battery 🔋 project in Kern, CA (CAISO). Proposed completion changed from November 1, 2023 to March 15, 2022
A tap on Twining 16 kV out of Jersey 66/16 kV Substation
— 0MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from February 7, 2025 to July 15, 2023
Arboles 16kV
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from March 31, 2017 to March 1, 2017
pole 1793304E on Lockhart 33 kV
— 7MW battery + solar 🔋☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to May 23, 2024
Terminal substation
— 199MW battery 🔋 project in Salt Lake, UT (PacifiCorp). Proposed completion changed from July 1, 2024 to February 6, 2031
Dice 33 kV
— 4MW battery 🔋 project in San Bernardino, CA (CAISO). Proposed completion changed to December 1, 2024
A tap on the Distribution Provider’s 33 kV Lockart distribution line out of the Kramer 33 kV Substation.
— 5MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed from December 31, 2023 to January 15, 2023
Skypark 12kV
— 0MW solar ☀️ project in Orange, CA (CAISO). Proposed completion changed from August 20, 2015 to August 1, 2015
33/115 kV Casa Diablo Substation at the 33 kV bus.
— 44MW geothermal 🌋 project in Mono, CA (CAISO). Proposed completion changed from February 1, 2020 to September 1, 2011
University substation
— 7MW gas 🔥 project in Salt Lake, UT (PacifiCorp). Proposed completion changed from December 1, 2007 to October 9, 2009
Doble 33kV
— 1MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to March 4, 2019
Bryant Circuit, La Fresa 66/16 Sub
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from May 15, 2016 to March 1, 2016
Calli Valli 12kV Circuit, Little Rock 66/12kV substation
— 1MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from September 1, 2012 to September 1, 2011
Hinkle substation
— 10MW wind 💨 project in Umatilla, OR (PacifiCorp). Proposed completion changed from December 30, 2016 to December 18, 2020
Rand 12 kV Line
— 0MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from April 2, 2018 to December 1, 2015
NE Corner of Amboy Road and Hillcrest Road
— 1MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to May 1, 2011
Indianapolis 12kV
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from June 14, 2019 to May 31, 2019
Solar
— 20MW solar ☀️ project in Androscoggin County, ME (ISO-NE). Proposed completion changed from February 25, 2025
Torson 16kV
— 0MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from October 8, 2014 to October 8, 2013
Pronghorn 12kV Ckt. 4605107E, POI 34.716865, -118.289406
— 4MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed to October 1, 2017
Silver City 138 kV Substation
— 100MW battery 🔋 project in Creek County, OK (SPP). Proposed completion changed from December 31, 2026 to December 31, 2027
Lighthipe Substation 66kV Bus
— 47MW gas 🔥 project in Los Angeles, CA (CAISO). Proposed completion changed to July 2, 2007
Sturgeon 12 kV
— 11MW battery + solar 🔋☀️ project in Tulare, CA (CAISO). Proposed completion changed to September 1, 2024
Midway-Union Gap transmission line
— 150MW battery + solar 🔋☀️ project in Yakima, WA (PacifiCorp). Proposed completion changed from October 1, 2025 to November 7, 2025
Seabrook Power Uprate7
— nuclear ☢️ project in Rockingham County, NH (ISO-NE). Proposed completion changed from October 31, 2006
Lat: 35.762375, -119.307088 Long: -119.307088. Existing 120/240V meter will be upgraded and relocated to a new 12kV switchgear located adjacent to the existing utility pole #4479812E
— 3MW solar ☀️ project in Kern, CA (CAISO). Proposed completion changed to December 1, 2016
Brayton Point 3 Uprate( see 243)
— 30MW coal 🏭 project in Bristol County, MA (ISO-NE). Proposed completion changed from December 12, 2011
Corona Substation 66kV
— 113MW battery 🔋 project in Riverside, CA (CAISO). Proposed completion changed to January 4, 2026
Bragdon 12 kV
— 2MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to July 2, 2026
34.829988, -116.627567
— 5MW project in San Bernardino, CA (CAISO). Proposed completion changed to May 31, 2025
pole 2299394E on Manzanillo 12 kV
— 11MW battery + solar 🔋☀️ project in Tulare, CA (CAISO). Proposed completion changed to September 1, 2024
Meadowbrook-Taylorsville 138 kV line
— 0MW solar ☀️ project in Salt Lake, UT (PacifiCorp). Proposed completion changed from May 20, 2014 to February 19, 2015
Storm 12kV
— 0MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from January 31, 2025 to November 15, 2024
Cambridge 12kV
— 0MW battery 🔋 project in Riverside, CA (CAISO). Proposed completion changed from March 15, 2018 to October 1, 2017
Twin Butte 12 kV
— 18MW battery + solar 🔋☀️ project in Tulare, CA (CAISO). Proposed completion changed to May 31, 2025
Comerford Unit #1
— -17MW hydro 💧 project in Grafton County, NH (ISO-NE). Proposed completion changed from November 30, 2009
Manchester Street Station Exciter Upgrades & incre
— 12MW gas 🔥 project in Providence County, RI (ISO-NE). Proposed completion changed from June 14, 2011
Harmony 12 kV Circuit, near structure 764247E, out of Bliss 66/12 kV Substation
— 5MW battery + solar 🔋☀️ project in Tulare, CA (CAISO). Proposed completion changed from October 1, 2024 to April 15, 2024
Manchester Street Station increase
— gas 🔥 project in Providence County, RI (ISO-NE). Proposed completion changed from August 2, 2010
Block Island Wind Farm
— 29MW wind 💨 project in Washington County, RI (ISO-NE). Proposed completion changed from December 9, 2016
Heavy 33kV
— 20MW solar ☀️ project in Kern, CA (CAISO). Proposed completion changed to December 31, 2010
Irvine Sub 12kV line
— 19MW fuel cell 🔋 project in Orange, CA (CAISO). Proposed completion changed from September 30, 2015 to October 1, 2009
Bragdon 12 kV circuit out of Harvard 33/12 kV Substation
— 3MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to April 1, 2024
Chris 12 kV line out of Watson 66/12 kV Substation
— 10MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from November 30, 2016 to October 31, 2016
Miler 12 kV
— 4MW battery + solar 🔋☀️ project in Los Angeles, CA (CAISO). Proposed completion changed to September 1, 2024
Aeolus substation
— 250MW wind 💨 project in Carbon, WY (PacifiCorp). Proposed completion changed from November 1, 2018 to November 1, 2020
Chrysler 16kV
— 0MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from September 30, 2024 to July 15, 2023
TOMAHAWK 12KV
— 1MW solar ☀️ project in Kern, CA (CAISO). Proposed completion changed to July 2, 2012
34.893038, -117.149175
— 10MW battery + solar 🔋☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to May 31, 2025
Money 12kV
— 0MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from December 8, 2017 to November 30, 2017
Alterra 12kV
— 0MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to December 1, 2011
Minneola 33/12 (D)
— 5MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to January 3, 2026
SPRAGUE 12KV
— 5MW solar ☀️ project in Orange, CA (CAISO). Proposed completion changed from December 30, 2013 to June 30, 2012
Pellet 12kV
— 1MW battery + fuel cell 🔋🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from November 16, 2018 to September 14, 2018
Santana 33kV
— 0MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to May 15, 2011
Tevis 12kV out of Stadium 66/16 kV Substation
— 0MW battery + solar 🔋☀️ project in Los Angeles, CA (CAISO). Proposed completion changed to February 28, 2018
North Oaks Substation at the 66 kV bus.
— 88MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from November 30, 2023 to October 15, 2020
Sunset 12 kV circuit
— 5MW solar ☀️ project in Tulare, CA (CAISO). Proposed completion changed to December 31, 2026
The point where the 66 kV tap line from Growers Substation interconnects to the Vestal-Growers-Kern River No. 3 66 kV Line
— 58MW solar ☀️ project in Tulare, CA (CAISO). Proposed completion changed from October 31, 2021 to May 1, 2019
Dylan 115 kV Substation at the 115 kV bus
— 116MW battery 🔋 project in Riverside, CA (CAISO). Proposed completion changed from March 1, 2024 to October 15, 2021
Bruin 66 kV Substation at the 66 kV bus
— 46MW battery + solar 🔋☀️ project in Kern, CA (CAISO). Proposed completion changed from October 1, 2028 to January 31, 2018
Lockhart 33 kV
— 4MW battery + solar 🔋☀️ project in San Bernardino, CA (CAISO). Proposed completion changed from December 1, 2023 to October 15, 2019
Bridgeport Energy PSS Tuning
— gas 🔥 project in Fairfield County, CT (ISO-NE). Proposed completion changed from October 28, 2016
Kenworth 12.47kV line connecting to the Roadway substation
— 3MW gas 🔥 project in San Bernardino, CA (CAISO). Proposed completion changed from June 1, 2020 to December 31, 2018
Pisces 12kV
— 0MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed to February 15, 2018
Stetson Wind II(Jimmey & Owl Mt.-UPC)
— 2MW wind 💨 project in Washington County, ME (ISO-NE). Proposed completion changed from March 12, 2010
Huron 12kV
— 1MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed to December 1, 2011
230 KV T-Line
— project in Chelan, WA (Chelan County Public Utility District). Proposed completion changed from February 1, 2026 to February 1, 2027
Grazide 12kV
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from June 25, 2018 to May 28, 2018
Barre 66 kV Bus
— 50MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed to April 30, 2019
Recovery 12 kV Line
— 1MW gas 🔥 project in Orange, CA (CAISO). Proposed completion changed from June 1, 2013 to June 30, 2012
A tap on the Distribution Provider’s Buckhorn 16 kV distribution line out of Fillmore 66/16 kV Substation
— 2MW solar ☀️ project in Ventura, CA (CAISO). Proposed completion changed from October 1, 2018 to June 30, 2018
SUN VILLAGE 12KV
— 1MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from July 1, 2013 to March 1, 2012
Riverside Substation, Great Falls, MT
— 3MW solar ☀️ project in Cascade County, MT (NorthWestern Energy). Proposed completion changed to July 31, 2016
Oasis 66 kV Bus
— 20MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from October 13, 2015 to August 1, 2013
Lilac Substation - Distribution Circuit 350
— 3MW solar ☀️ project in San Diego, CA (CAISO). Proposed completion changed from June 1, 2014 to February 1, 2016
Craig 345kV Substation
— 299MW battery + solar 🔋☀️ project in Moffat County, CO (Tri-State Generation and Transmission Association). Proposed completion changed to June 25, 2030
SANTANA 33 kV line
— 0MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed from September 20, 2012 to October 15, 2012
Medway Peaker - SEMARI
— 207MW gas + oil 🔥⛽ project in Norfolk County, MA (ISO-NE). Proposed completion changed from March 14, 2019
Ponderosa-Houston Lake transmission line
— 60MW solar ☀️ project in Crook, OR (PacifiCorp). Proposed completion changed from July 1, 2018 to February 28, 2021
Elden 12kV
— 0MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from February 2, 2018 to February 18, 2018
Marriott 12kV
— 0MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from November 11, 2019 to September 13, 2019
Litchfield substation - NG Western MA Area Cluster Study
— 9MW solar ☀️ project in Worcester County, MA (ISO-NE). Proposed completion changed from April 30, 2021
Styx PT 12kV
— 3MW project in San Bernardino, CA (CAISO). Proposed completion changed to November 1, 2022
GEE BEE 12KV
— 1MW solar ☀️ project in Tulare, CA (CAISO). Proposed completion changed from January 17, 2014 to October 1, 2012
A tap on the Distribution Provider’s Hackman 33 kV distribution line out of Searles 115/33 kV Substation via a line extension to the Customer-owned 38.0 kV rated switchboard.
— 1MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed from September 1, 2021 to October 17, 2018
Bridgeport Energy Uprate
— 84MW gas 🔥 project in Fairfield County, CT (ISO-NE). Proposed completion changed from June 5, 2015
Torson 16kV
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from April 30, 2019 to December 28, 2018
Vestal Substation 66 kV bus
— 106MW battery + solar 🔋☀️ project in Tulare, CA (CAISO). Proposed completion changed from September 15, 2024 to September 15, 2023
Empresa 12kV
— 0MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from January 15, 2018 to December 4, 2017
N. Oxford Substation - NG Western MA Area Cluster Study
— 8MW solar ☀️ project in Worcester County, MA (ISO-NE). Proposed completion changed from December 30, 2020
Otay Mesa Substation - Distribution Circuit 150
— 1MW gas 🔥 project in San Diego, CA (CAISO). Proposed completion changed from April 1, 2013 to June 18, 2013
Hillclimber Solar, Givens-Mechanicsburg 138 kV
— 40MW battery 🔋 project in Champaign County, OH (PJM). Proposed completion changed from December 1, 2021 to September 30, 2029
Midge 12 kV
— 5MW solar ☀️ project in Kern, CA (CAISO). Proposed completion changed to September 1, 2024
Existing System on Line 40 from White City to Vilas Road
— 30MW biomass 🌿 project in Jackson, OR (PacifiCorp). Proposed completion changed from September 10, 2007 to February 3, 2009
Circuit 4U30 out of Southgate substation
— 1MW biogas 🌿 project in Douglas, OR (PacifiCorp). Proposed completion changed from October 1, 2011 to November 21, 2011
Heisman 12 kV Circuit
— 2MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from December 5, 2026 to October 3, 2026
Windhub 66 kV Substation at the 66kV bus
— 25MW solar ☀️ project in Kern, CA (CAISO). Proposed completion changed from July 20, 2019 to March 1, 2011
Intrepid 16 kV circuit out of Newbury 66/12 kV Substation
— 2MW battery 🔋 project in Ventura, CA (CAISO). Proposed completion changed from January 15, 2020 to February 1, 2020
Stitzer 12kV
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from December 1, 2018 to August 1, 2018
The Distribution Provider’s Goleta-Isla Vista-Onshore 66 kV line via Ellwood Substation
— 39MW battery 🔋 project in Santa Barbara, CA (CAISO). Proposed completion changed from November 1, 2025 to August 30, 2024
Hinkle substation
— 6MW wind 💨 project in Umatilla, OR (PacifiCorp). Proposed completion changed from December 15, 2007 to February 23, 2009
Circuit WCD28 out of West Cedar substation
— 3MW solar ☀️ project in Iron, UT (PacifiCorp). Proposed completion changed from May 30, 2016 to December 13, 2016
Hughes Lake 12 kV Circuit
— 6MW battery + solar 🔋☀️ project in Los Angeles, CA (CAISO). Proposed completion changed to October 31, 2019
Deer 12 kV
— 10MW battery + solar 🔋☀️ project in Tulare, CA (CAISO). Proposed completion changed to November 15, 2025
White Lake Substation, SD
— 20MW wind 💨 project in Aurora County, SD (NorthWestern Energy). Proposed completion changed to December 1, 2016
Artisano 16kV
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from June 28, 2017 to April 28, 2017
Pence 12 kV
— 0MW solar ☀️ project in Orange, CA (CAISO). Proposed completion changed from March 31, 2023 to December 1, 2022
34.5kV
— 10MW wind 💨 project in Cassia County, ID (Idaho Power Company). Proposed completion changed from January 1, 2004 to December 1, 2010
Goleta 66kV Substation
— 102MW gas 🔥 project in Santa Barbara, CA (CAISO). Proposed completion changed to May 1, 2009
Northwest substation
— 25MW gas 🔥 project in Salt Lake, UT (PacifiCorp). Proposed completion changed from January 1, 2004 to October 6, 2004
Wakefield 66 kV bus
— 18MW battery 🔋 project in Ventura, CA (CAISO). Proposed completion changed from August 1, 2025 to March 1, 2022
SCE 66KV Vestal Substation
— 50MW battery 🔋 project in Kern, CA (CAISO). Proposed completion changed to July 1, 2022
Alturas-Mile Hi transmission line
— 46MW solar ☀️ project in Lake, OR (PacifiCorp). Proposed completion changed from December 1, 2017 to November 1, 2019
Bow 12kV
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed to May 25, 2017
DESERT CENTER 12KV
— 1MW solar ☀️ project in Riverside, CA (CAISO). Proposed completion changed from July 27, 2014 to December 31, 2012
Goshen-Hanford 66kV
— 10MW solar ☀️ project in Kings, CA (CAISO). Proposed completion changed to September 1, 2014
Maplewood
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from January 31, 2017 to October 31, 2016
Canyon View Rd and Desert View Rd, Apple Valley CA 92308
— 1MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed from December 31, 2012 to December 31, 2011
Ellis 66kV Substation
— 111MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed to June 30, 2021
Melrose Substation - Distribution Circuit 0206
— 2MW other storage 🔋 project in San Diego, CA (CAISO). Proposed completion changed from September 30, 2015 to October 31, 2017
Hampshire 16kV
— 0MW battery + solar 🔋☀️ project in Ventura, CA (CAISO). Proposed completion changed from October 4, 2019 to August 12, 2019
Sturgeon 12kV circuit
— 5MW solar ☀️ project in Tulare, CA (CAISO). Proposed completion changed to September 1, 2024
Norton 12kV
— 0MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed to June 30, 2011
Foxglove 12kV
— 0MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from February 28, 2018 to December 15, 2017
Silver Maple Wind CNR
— wind 💨 project in Penobscot County, ME (ISO-NE). Proposed completion changed from December 14, 2022
Apex 16kV
— 0MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed to February 28, 2014
The Distribution Provider’s 3-way switch on the Distribution Provider’s Cribbage 12kV distribution line out of Johanna 66/12kv Substation
— 10MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from November 15, 2019 to December 1, 2018
Regal 12kV
— 0MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed to December 1, 2011
Waterside Power
— gas 🔥 project in Fairfield County, CT (ISO-NE). Proposed completion changed from June 1, 2003
Seabrook LP Turbine Blade replacement
— 13MW nuclear ☢️ project in Rockingham County, NH (ISO-NE). Proposed completion changed from April 5, 2012
New 16 kV Distribution Circuit out of Elizabeth Lake 66/16 kV Substation via a new 16 kV circuit
— 15MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from December 1, 2023 to November 1, 2022
Kendall Reconfiguration Project
— 1MW gas + oil 🔥⛽ project in Middlesex County, MA (ISO-NE). Proposed completion changed from May 31, 2016
Olinda Substation 66 kV
— 127MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from April 1, 2026 to January 4, 2026
480V secondary side of the SCE provided serviced transformer
— 1MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to December 10, 2012
Showcase 16kV
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from June 1, 2015 to December 20, 2015
ANDRETTI 12KV
— 0MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed from May 31, 2011 to December 1, 2012
San Ysidro 2.4kV
— 0MW battery 🔋 project in Santa Barbara, CA (CAISO). Proposed completion changed from September 30, 2018 to August 2, 2018
Moore Station Uprate
— 4MW hydro 💧 project in Grafton County, NH (ISO-NE). Proposed completion changed from October 18, 2023
Dolores Ave. Cabazon, CA 92230
— 0MW solar ☀️ project in Riverside, CA (CAISO). Proposed completion changed from March 30, 2013 to March 30, 2011
Raven substation
— 80MW solar ☀️ project in Sweetwater, WY (PacifiCorp). Proposed completion changed from November 1, 2018 to December 3, 2018
Hunt–Milner 138kV Line
— 120MW solar ☀️ project in Jerome, ID (Idaho Power Company). Proposed completion changed from December 1, 2020 to October 31, 2023
230kV
— 20MW wind 💨 project in Elmore County, ID (Idaho Power Company). Proposed completion changed from June 30, 2011 to May 31, 2012
Darby 4.16kV
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from February 15, 2018 to October 19, 2017
Huntington Power Plant, Huntington, Utah
— 17MW coal 🏭 project in Emery, UT (PacifiCorp). Proposed completion changed from December 26, 2015 to May 2, 2012
Churchill 12kV
— 0MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from June 1, 2018 to January 1, 2018
138kV
— 40MW wind 💨 project in Twin Falls, ID (Idaho Power Company). Proposed completion changed from December 31, 2010 to November 15, 2012
Union Gap - Midway line
— 94MW battery + solar 🔋☀️ project in Yakima, WA (PacifiCorp). Proposed completion changed from December 1, 2020 to November 20, 2023
Beijing 12 kV line
— 2MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from June 30, 2018 to October 31, 2017
Stealth 12kV Ckt. VS631361, POI 34.646189, -118.095377
— 2MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed to October 1, 2017
Nashua-St. Joe 345kV
— 400MW solar ☀️ project in Hodgeman County, KS (SPP). Proposed completion changed from June 1, 2029 to January 15, 2029
Tanager 12kV
— 0MW battery + solar 🔋☀️ project in Kern, CA (CAISO). Proposed completion changed from September 23, 2019 to April 23, 2019
A tap on the Distribution Provider’s existing Montara 33 kV distribution line out of Barstow 33 kV Substation via an overhead line extension to the Distribution Customer-owned 35.0 kV switchboard
— 3MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed from August 1, 2020 to July 31, 2019
Bloom Energy Fuel Cell
— 10MW other 🔌 project in New London County, CT (ISO-NE). Proposed completion changed from October 20, 2021
Circuit PAN12 out of Panguitch substation
— 1MW battery 🔋 project in Garfield, UT (PacifiCorp). Proposed completion changed from May 31, 2018 to January 16, 2020
INDEPENDENCE-ISES - POWERLINE ROAD 500.0kV
— 652MW solar ☀️ project in Jackson County, AR (MISO). Proposed completion changed from February 2, 2024 to July 20, 2029
Lake Road Generating Unit 3
— gas + oil 🔥⛽ project in Windham County, CT (ISO-NE). Proposed completion changed from May 22, 2002
Pecos 12kV
— 0MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from July 10, 2018 to October 1, 2017
The Distribution Provider's Vella 33 kV circuit out of Eisenhower 115/33 kV Substation
— 13MW battery 🔋 project in Riverside, CA (CAISO). Proposed completion changed from November 1, 2022 to January 2, 2021
Weeks 12 kV line out of Narod 66/12 kV Substation
— 10MW battery 🔋 project in San Bernardino, CA (CAISO). Proposed completion changed from November 30, 2016 to October 31, 2016
Craig-Meeker 345kV Line
— 145MW solar ☀️ project in Moffat County, CO (Tri-State Generation and Transmission Association). Proposed completion changed to June 30, 2024
Armijo 12 kV Circuit
— 5MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to April 1, 2025
El Nido: Seabass 16 kV line
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from September 25, 2014 to January 8, 2013
Riverview Substation
— 2MW hydro 💧 project in Cascade County, MT (NorthWestern Energy). Proposed completion changed to April 2, 2021
Radnor 12kV Circuit
— 10MW battery + solar 🔋☀️ project in Tulare, CA (CAISO). Proposed completion changed to September 1, 2024
Cady Substation at 34.5 kV
— 10MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to September 1, 2012
the Tejon 12kV circuit out of the Neenach 66/12kV Substation
— 3MW wind 💨 project in Los Angeles, CA (CAISO). Proposed completion changed from March 1, 2019 to February 1, 2018
Rockair leg of Helijet - Little Rock - Palmdale - Rockair 66 kV line
— 50MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed to March 1, 2011
Krypton 12kV
— 0MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from November 1, 2018 to August 27, 2018
Cardiff 12: LENA 12 kV line
— 0MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed from November 1, 2013 to June 30, 2011
SUN VILLAGE 12KV
— 1MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from July 1, 2013 to March 1, 2012
Roadway 12kV
— 2MW battery 🔋 project in San Bernardino, CA (CAISO). Proposed completion changed to June 7, 2024
Chula Vista Substation - Distribution Circuit 152
— 3MW other storage 🔋 project in San Diego, CA (CAISO). Proposed completion changed from July 1, 2022 to June 8, 2023
Circuit 4K36 out of Dalreed substation
— 9MW wind 💨 project in Morrow, OR (PacifiCorp). Proposed completion changed from February 1, 2007 to July 15, 2009
Dogbane 12 kV Circuit
— 5MW battery 🔋 project in Kern, CA (CAISO). Proposed completion changed from February 1, 2026 to March 1, 2024
Riptide 16kV
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from May 31, 2017 to April 1, 2017
Shell 12kV
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from December 31, 2016 to October 31, 2016
Reed Point Substation, Reed Point
— 2MW solar ☀️ project in Stillwater County, MT (NorthWestern Energy). Proposed completion changed to April 1, 2016
A tap on the Distribution Provider’s Milk 12 kV distribution line out of Tulare 66/12 kV Substation
— 3MW solar ☀️ project in Tulare, CA (CAISO). Proposed completion changed from June 19, 2019 to July 1, 2017
GMP Essex Diesel
— oil ⛽ project in Chittenden County, VT (ISO-NE). Proposed completion changed from October 30, 2007
Krypton 12kV
— 0MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from October 1, 2018 to May 4, 2018
Queensland 12kV
— 3MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from October 30, 2012 to October 30, 2015
Elliott Substation, 12kv Circuit 1266
— 10MW other storage 🔋 project in San Diego, CA (CAISO). Proposed completion changed from October 31, 2020 to October 18, 2023
Salem Harbor Unit 3 Exciter Replacement
— coal 🏭 project in Essex County, MA (ISO-NE). Proposed completion changed from May 4, 2007
12.5kV
— 3MW wind 💨 project in Baker, OR (Idaho Power Company). Proposed completion changed from January 1, 2009 to November 25, 2011
Weston P substation at 69 kV, on the line Athena side of the NO switch
— 18MW wind 💨 project in Umatilla, OR (PacifiCorp). Proposed completion changed from November 30, 2015 to October 15, 2016
Shooter 12kV
— 1MW battery + gas 🔋🔥 project in Orange, CA (CAISO). Proposed completion changed from March 15, 2020 to March 1, 2020
Hinkle substation
— 1MW wind 💨 project in Umatilla, OR (PacifiCorp). Proposed completion changed from December 15, 2007 to January 11, 2010
Francis 66 kV Substation at the 66 kV bus.
— 42MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from April 30, 2025 to October 30, 2022
Boone 12 kV
— 11MW solar ☀️ project in Kern, CA (CAISO). Proposed completion changed to September 1, 2024
Goldtown 66/12kV Substation connected to the Boxcar 12 kV circuit
— 3MW solar ☀️ project in Kern, CA (CAISO). Proposed completion changed from July 7, 2017 to December 1, 2016
Margarita Substation, Distribution Circuit 983
— 1MW solar ☀️ project in San Diego, CA (CAISO). Proposed completion changed from August 31, 2018 to December 30, 2019
Bluefield 12 kV
— 0MW solar ☀️ project in Orange, CA (CAISO). Proposed completion changed to July 15, 2023
Amps substation
— 200MW battery + solar 🔋☀️ project in Clark, ID (PacifiCorp). Proposed completion changed from December 1, 2023 to December 20, 2030
Cottonwood-Savage 115 kV line near Cottonwood substation
— 200MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to January 1, 2010
Emery substation
— 200MW battery + solar 🔋☀️ project in Emery, UT (PacifiCorp). Proposed completion changed from December 31, 2018 to August 31, 2024
Victor-Black Mountain-Soport-Southcap-Southdown 115 kV line at Southdown Substation
— 20MW gas 🔥 project in San Bernardino, CA (CAISO). Proposed completion changed from April 1, 2022 to April 1, 2021
Seabrook PSS Enabling
— nuclear ☢️ project in Rockingham County, NH (ISO-NE). Proposed completion changed from November 1, 2009
Concho Solar I
— 17MW solar ☀️ project in Queen Annes County, MD (PJM). Proposed completion changed from June 3, 2027 to June 3, 2024
Milford Upgrades - Phase I
— 16MW gas 🔥 project in New Haven County, CT (ISO-NE). Proposed completion changed from June 5, 2017
Vestal Substation 66 kV bus
— 88MW battery 🔋 project in Kern, CA (CAISO). Proposed completion changed from November 1, 2023 to March 15, 2022
A tap on Twining 16 kV out of Jersey 66/16 kV Substation
— 0MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from February 7, 2025 to July 15, 2023
Arboles 16kV
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from March 31, 2017 to March 1, 2017
pole 1793304E on Lockhart 33 kV
— 7MW battery + solar 🔋☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to May 23, 2024
Terminal substation
— 199MW battery 🔋 project in Salt Lake, UT (PacifiCorp). Proposed completion changed from July 1, 2024 to February 6, 2031
Dice 33 kV
— 4MW battery 🔋 project in San Bernardino, CA (CAISO). Proposed completion changed to December 1, 2024
A tap on the Distribution Provider’s 33 kV Lockart distribution line out of the Kramer 33 kV Substation.
— 5MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed from December 31, 2023 to January 15, 2023
Skypark 12kV
— 0MW solar ☀️ project in Orange, CA (CAISO). Proposed completion changed from August 20, 2015 to August 1, 2015
33/115 kV Casa Diablo Substation at the 33 kV bus.
— 44MW geothermal 🌋 project in Mono, CA (CAISO). Proposed completion changed from February 1, 2020 to September 1, 2011
University substation
— 7MW gas 🔥 project in Salt Lake, UT (PacifiCorp). Proposed completion changed from December 1, 2007 to October 9, 2009
Doble 33kV
— 1MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to March 4, 2019
Bryant Circuit, La Fresa 66/16 Sub
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from May 15, 2016 to March 1, 2016
Calli Valli 12kV Circuit, Little Rock 66/12kV substation
— 1MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from September 1, 2012 to September 1, 2011
Hinkle substation
— 10MW wind 💨 project in Umatilla, OR (PacifiCorp). Proposed completion changed from December 30, 2016 to December 18, 2020
Rand 12 kV Line
— 0MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from April 2, 2018 to December 1, 2015
NE Corner of Amboy Road and Hillcrest Road
— 1MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to May 1, 2011
Indianapolis 12kV
— 0MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from June 14, 2019 to May 31, 2019
Solar
— 20MW solar ☀️ project in Androscoggin County, ME (ISO-NE). Proposed completion changed from February 25, 2025
Torson 16kV
— 0MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from October 8, 2014 to October 8, 2013
Pronghorn 12kV Ckt. 4605107E, POI 34.716865, -118.289406
— 4MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed to October 1, 2017
Silver City 138 kV Substation
— 100MW battery 🔋 project in Creek County, OK (SPP). Proposed completion changed from December 31, 2026 to December 31, 2027
Lighthipe Substation 66kV Bus
— 47MW gas 🔥 project in Los Angeles, CA (CAISO). Proposed completion changed to July 2, 2007
Sturgeon 12 kV
— 11MW battery + solar 🔋☀️ project in Tulare, CA (CAISO). Proposed completion changed to September 1, 2024
Midway-Union Gap transmission line
— 150MW battery + solar 🔋☀️ project in Yakima, WA (PacifiCorp). Proposed completion changed from October 1, 2025 to November 7, 2025
Seabrook Power Uprate7
— nuclear ☢️ project in Rockingham County, NH (ISO-NE). Proposed completion changed from October 31, 2006
Lat: 35.762375, -119.307088 Long: -119.307088. Existing 120/240V meter will be upgraded and relocated to a new 12kV switchgear located adjacent to the existing utility pole #4479812E
— 3MW solar ☀️ project in Kern, CA (CAISO). Proposed completion changed to December 1, 2016
Brayton Point 3 Uprate( see 243)
— 30MW coal 🏭 project in Bristol County, MA (ISO-NE). Proposed completion changed from December 12, 2011
Corona Substation 66kV
— 113MW battery 🔋 project in Riverside, CA (CAISO). Proposed completion changed to January 4, 2026
Bragdon 12 kV
— 2MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to July 2, 2026
34.829988, -116.627567
— 5MW project in San Bernardino, CA (CAISO). Proposed completion changed to May 31, 2025
pole 2299394E on Manzanillo 12 kV
— 11MW battery + solar 🔋☀️ project in Tulare, CA (CAISO). Proposed completion changed to September 1, 2024
Meadowbrook-Taylorsville 138 kV line
— 0MW solar ☀️ project in Salt Lake, UT (PacifiCorp). Proposed completion changed from May 20, 2014 to February 19, 2015
Storm 12kV
— 0MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from January 31, 2025 to November 15, 2024
Cambridge 12kV
— 0MW battery 🔋 project in Riverside, CA (CAISO). Proposed completion changed from March 15, 2018 to October 1, 2017
Twin Butte 12 kV
— 18MW battery + solar 🔋☀️ project in Tulare, CA (CAISO). Proposed completion changed to May 31, 2025
Comerford Unit #1
— -17MW hydro 💧 project in Grafton County, NH (ISO-NE). Proposed completion changed from November 30, 2009
Manchester Street Station Exciter Upgrades & incre
— 12MW gas 🔥 project in Providence County, RI (ISO-NE). Proposed completion changed from June 14, 2011
Harmony 12 kV Circuit, near structure 764247E, out of Bliss 66/12 kV Substation
— 5MW battery + solar 🔋☀️ project in Tulare, CA (CAISO). Proposed completion changed from October 1, 2024 to April 15, 2024
Manchester Street Station increase
— gas 🔥 project in Providence County, RI (ISO-NE). Proposed completion changed from August 2, 2010
Block Island Wind Farm
— 29MW wind 💨 project in Washington County, RI (ISO-NE). Proposed completion changed from December 9, 2016
Heavy 33kV
— 20MW solar ☀️ project in Kern, CA (CAISO). Proposed completion changed to December 31, 2010
Irvine Sub 12kV line
— 19MW fuel cell 🔋 project in Orange, CA (CAISO). Proposed completion changed from September 30, 2015 to October 1, 2009
Bragdon 12 kV circuit out of Harvard 33/12 kV Substation
— 3MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to April 1, 2024
Chris 12 kV line out of Watson 66/12 kV Substation
— 10MW battery 🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from November 30, 2016 to October 31, 2016
Miler 12 kV
— 4MW battery + solar 🔋☀️ project in Los Angeles, CA (CAISO). Proposed completion changed to September 1, 2024
Aeolus substation
— 250MW wind 💨 project in Carbon, WY (PacifiCorp). Proposed completion changed from November 1, 2018 to November 1, 2020
Chrysler 16kV
— 0MW solar ☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from September 30, 2024 to July 15, 2023
TOMAHAWK 12KV
— 1MW solar ☀️ project in Kern, CA (CAISO). Proposed completion changed to July 2, 2012
34.893038, -117.149175
— 10MW battery + solar 🔋☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to May 31, 2025
Money 12kV
— 0MW battery 🔋 project in Orange, CA (CAISO). Proposed completion changed from December 8, 2017 to November 30, 2017
Alterra 12kV
— 0MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to December 1, 2011
Minneola 33/12 (D)
— 5MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to January 3, 2026
SPRAGUE 12KV
— 5MW solar ☀️ project in Orange, CA (CAISO). Proposed completion changed from December 30, 2013 to June 30, 2012
Pellet 12kV
— 1MW battery + fuel cell 🔋🔋 project in Los Angeles, CA (CAISO). Proposed completion changed from November 16, 2018 to September 14, 2018
Santana 33kV
— 0MW solar ☀️ project in San Bernardino, CA (CAISO). Proposed completion changed to May 15, 2011
U.S. county map of waste heat interconnection requests, 1996-2025
- No. requests
- 36
- Total capacity
- 767.59 MW
For type waste Heat
Data last updated Mar 29, 2025, 9:09 PM UTC
1996-2025 interconnection capacity over time, all states, by date enqueued
- Total Interconnection Requests
- Total Capacity (MW)
- No. requests
- 36
- Total capacity
- 767.59 MW
For type waste Heat
1996-2025 interconnection requests & capacity by state
- Total Interconnection Requests
- Total Capacity (MW)
Current active in queue capacity by power market and generation type
Current active in queue capacity by power market and generation type

Data Table
Data last updated Mar 29, 2025, 9:09 PM UTC
(Click here to expand table to full screen)- No. requests
- 36
- Total capacity
- 767.59 MW
For type waste Heat
FAQs
Q: Where is this data from?
A: This dataset has been built using publicly-available data from ISOs/RTOS and non-ISO utilities. We update this data at least once a day.
Q: What is an ISO, RTO, and/or non-ISO utility?
A: An Independent System Operator (ISO) or Regional Transmission Organization (RTO) is a non-profit organization that operates the high-voltage electric power transmission grid in a specific region, ensuring reliability and providing non-discriminatory access. ISOs and RTOs play a critical role in the electric power industry, helping to ensure that the grid is reliable and that electricity is delivered to consumers at a reasonable cost. Learn more about ISOs and RTOs here.A non-ISO utility is an electric utility that does not operate under the umbrella of an ISO or RTO. Non-ISO utilities are typically smaller utilities that operate in rural or remote areas, facing challenges such as meeting the same reliability standards as ISOs and RTOs, but without the same resources and economies of scale.
Q: What is an interconnection queue?
A: What is an interconnection queue?
An interconnection queue is a list of power generation and transmission projects that have requested to connect to the electric grid. The queue is managed by the grid operator, which is typically an independent system operator (ISO) or regional transmission organization (RTO).
Q: Why is the interconnection queue important?
A: The interconnection queue is important because it ensures that new power generation and transmission projects can be safely and reliably connected to the grid. The grid operator reviews each project to assess its impact on the grid and to make sure that it will not compromise the reliability of the electric system. To learn more about interconnection queues, see this NPR Planet Money episode"Green Energy Gridlock"and this article/podcast from Volts.
Q: Where can I contact the owners, submit feature requests, get data, or submit an error?
A: Please email us if you have any questions, see an error, want to request data, or have feature requests.
Q: Who are you?
A: 👋 This tool is brought to you by Chris Talley and Steven Zhang . We are long-time Silicon Valley software engineers who build tools to help people discover public structured and unstructured data. Check out our work here:
We also run a low-code/automation consultancy here: Deal Ops Automation — low-code & no-code consultancy.
- ClimateTechList - the web's most comprehensive climate tech jobs site (30,000+ jobs from 1,000 climate tech companies, updated daily
- WARN Tracker- Live Layoffs from Public WARN records
We also run a low-code/automation consultancy here: Deal Ops Automation — low-code & no-code consultancy.
Q: How can I access the underlying data?
A:
Interconnection.fyi
Tracking U.S. ISO & utility interconnection queues
Stay up to date via our email newsletter:
Interconnection requests in list format
All transmission grid interconnection requests All distribution grid (DG) interconnection requestsInsights
Charts State of interconnection queues — January 2024All blog postsOther energy & climate tools
Inflation Reduction Act Bill Text Viewer ToolClimate Tech Jobs Tracker (30,000+ jobs)Climate Tech Hiring Trends & ChartsRequests by power market
Requests by status
Interconnection queue requests by state
Interconnection queue requests by generation transmission owner
Alberta Electric System OperatorAllegheny PowerAlliant Energy EastAlliant Energy WestAmeren IllinoisAmeren MissouriAmerican Electric PowerAmerican Municipal PowerAmerican Transmission CompanyAmerican Transmission SystemsArizona Public ServiceArkansas Electric Cooperative CorporationAssociated Electric CooperativeAvista UtilitiesBaltimore Gas and ElectricBangor Hydro ElectricBasin Electric Power CooperativeBig Rivers Electric CorporationBlack Hills Cheyenne Light Fuel and Power TransmissionBlack Hills Colorado ElectricBlack Hills PowerBonneville Power AdministrationCedar Falls UtilitiesCentral Hudson Gas and ElectricCentral Maine PowerCentral Power Electric CooperativeChelan County Public Utility DistrictCity Utilities of Springfield MissouriCity Water, Light and PowerCity of Columbia, MissouriCity of Muscatine, IowaCleco HoldingsColorado River Storage Project TransmissionColorado Springs UtilitiesCommonwealth EdisonConsolidated EdisonConsumers EnergyCooperative EnergyCorn Belt Power CooperativeDCR TransmissionDairyland Power CooperativeDayton Power and LightDelmarva Power and LightDesertLinkDominion EnergyDominion Energy South CarolinaDuke EnergyDuke Energy CarolinasDuke Energy FloridaDuke Energy IndianaDuke Energy Ohio and KentuckyDuke Energy ProgressDuquesne Light CompanyEast Kentucky Power CooperativeEast River Electric Power CooperativeEast Texas Electric CooperativeEl Paso ElectricEmpire District Electric CompanyEntergyEntergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy TexasEssential PowerEvergyEvergy Missouri WestEversourceEwington Energy SystemsFirstEnergyFlorida Power and LightGeorgia TransmissionGrand River Dam AuthorityGrand River EnergyGrant County Public Utility DistrictGridLianceGridLiance WestGridUnityHenderson Municipal Power and LightHoosier EnergyHorizon West TransmissionISO New EnglandITC Great PlainsITC MidwestITC TransmissionIdaho Power CompanyImperial Irrigation DistrictIndependence Power and LightIndianapolis Power and LightJacksonville Electric AuthorityJersey Central Power and LightKACYKansas City Board of Public UtilitiesKansas City Power and LightKansas Power PoolLS PowerLS Power Grid New YorkLafayette Utilities SystemLea County Electric Cooperative
Lincoln Electric SystemLong Island Power AuthorityLos Angeles Department of Water and PowerLouisville Gas and Electric and Kentucky Utilities EnergyLoveland Area Projects TransmissionLower Yellowstone Rural Electric CooperativeMadison Gas and ElectricMaine Public ServiceManitoba HydroMetropolitan Edison CompanyMichigan Electric Transmission CompanyMichigan Public Power AgencyMid-Kansas Electric CompanyMidAmerican EnergyMidcontinent Independent System OperatorMidwest EnergyMinnesota PowerMinnkota Power CooperativeMissouri River Energy ServicesMissouri Western Energy CorporationMontana-Dakota UtilitiesMunicipal Commission of BoonvilleNAEANV EnergyNational GridNavajo-CrystalNebraska Public Power DistrictNew York Power AuthorityNew York State Electric and GasNew York TranscoNextEra Energy TransmissionNorthWestern EnergyNortheast UtilitiesNorthern Indiana Public ServiceNorthern States Power CompanyNorthwest Iowa Power CooperativeNorthwestern Wisconsin Electric CompanyOhio Valley Electric CorporationOklahoma Gas and ElectricOld Dominion Electric CooperativeOmaha Public Power DistrictOrange and RocklandOrlando Utilities CommissionOtter Tail Power CompanyPECO Energy CompanyPJMPPL CorporationPacifiCorpPacific Gas and Electric CompanyPennsylvania Electric CompanyPlatte River Power AuthorityPortland General ElectricPotomac Electric Power CompanyPrairie PowerPublic Service Company Of ColoradoPublic Service Company of New MexicoPublic Service Electric and GasPuget Sound EnergyRochester Gas and ElectricRochester Public UtilitiesRockland Electric CompanySacramento Municipal Utility DistrictSalt River ProjectSan Diego Gas and ElectricSantee CooperSeminole Electric CooperativeSouth Mississippi Electric Power AssociationSouthern California EdisonSouthern CompanySouthern Illinois Power CooperativeSouthern Indiana Gas and Electric CompanySouthern Maryland Electric CooperativeSouthern Minnesota Municipal Power AgencySouthwestern Power AdministrationSouthwestern Public Service CompanySunflower Electric Power CorporationTacoma Public UtilitiesTampa Electric CompanyTennessee Valley AuthorityTransource MissouriTri-State Generation and Transmission AssociationTucson Electric PowerUnited Gas Improvement CompanyUnited Illuminating CompanyUpper Peninsula Power CompanyValley Electric AssociationVillage of ArcadeWAPA Sierra NevadaWAPA/BEPC/HCPD Integrated SystemWabash Valley Power AssociationWestar EnergyWestern Area Power AdministrationWestern Area Power Administration Desert Southwest RegionWestern Farmers Electric CooperativeWisconsin Electric Power CompanyWisconsin Public Service CorporationWolverine Power Supply CooperativeXcel Energy
Interconnection requests by year
Requests in 2025Requests in 2024Requests in 2023Requests in 2022Requests in 2021Requests in 2020Requests in 2019Requests in 2018Requests in 2017Requests in 2016Requests in 2015Requests in 2014Requests in 2013Requests in 2012Requests in 2011Requests in 2010Requests in 2009Requests in 2008Requests in 2007Requests in 2006Requests in 2005Requests in 2004Requests in 2003Requests in 2002Requests in 2001Requests in 2000Requests in 1999Requests in 1998Requests in 1997Requests in 1996Requests in 1989© 2025 Interconnection.fyi. All rights reserved.